Some of more significant investments completed by the PROINSTAL Design and Implementation Company Sp. z o.o. in a few last years are listed below:

  • Danone Sp. z o.o. Bieruń
    • Design and construction of water treatment station of 135 m3/h of capacity for process needs 
    • Steam boiler house 3x12 Mg/h within the premises of Danone Fabryka in Bieruń
  • Philip Morris Polska S.A., Krakow
    • Construction of G5 production and storage hall (Filter Production Dept.)
    • Design and construction of 32 MW gas-oil boiler room for process and heating needs
  • GM Opel Polska Sp. z o.o., Gliwice
    Development of technical documentation of installations listed below:
    • cooling water and compressed air system as well as assembly with connecting the utilities to process equipment in vehicle body and moulding department halls being under extension,
    • cooling water, compressed air and gas systems in a paint shop,
    • water and sewage systems in new rest and refreshment rooms (group rooms) and sanitary units in a vehicle body dept., final assembly dept. and a paint shop.
    • heating water system (MTHW) in a vehicle body and final assembly departments.
    • Ventilation and air-conditioning system of the G6 laboratory hall
    • Execution of halls’ heating system for the time of construction
  • Huta Batory (Batory Still Mill) S.A., Chorzów
    • Design and renovation of industrial water circuits for Tube Rolling Mill and Steel Mill. New cooling system for all casting furnaces
    • Design and construction of steam boiler room of the capacity of 12t/h of superheated steam of pressure of 16 bar and temperature of 300°C for the needs of steel degassing process (VAD technology)
  • Odlewnia Żeliwa (Cast Iron Foundry) S.A., Zawiercie
    • Design and construction of new dedusting system in foundry dept. – replacement of wet dedusting technology with dry one
    • Design and construction of waste heat recovery system from a compression room and cooling room for heating purposes
    • Design and construction of waste heat recovery system from drying tunnels for process purposes
    • Design and construction of 300 kW oil boiler room on the premises of the Cast Iron Foundry in Zawiercie.
  • Petrochemia Blachownia S.A., Kędzierzyn-Koźle
    • Construction of a steam boiler house 2x25 Mg/h for technological and heating purposes
  • ICSO Chemical Production Sp. z o.o., Kędzierzyn-Koźle
    • Designing and erection of a steam boiler house 1x1.5 Mg/h for technological and heating purposes
  • Kompania Spirytusowa Wratislavia Polmos Wrocław S.A., Wrocław
    Design and construction of steam boiler room of the capacity of 18 l of steam/h for the process purposes of the ethylene esters for bio-fuels production line.
  • Euronaft Trzebinia Sp. z o.o. (Trzebinia S.A. Refinery Group), Trzebinia
    Construction of process installations for candle production line (pulveriser process line) including cooling circuit and process heat system assembly
  • Leszno Shopping Mall
    Comprehensive preparation, organisation and completion of internal sanitary units including development of detailed construction documentation and as built technical documentation called “Construction of Leszno Shopping Mall” including: heating substation, central heating and process heat system, cold distribution system, cold and hot tap water system, sanitary and process sewage system, hydrant system, ventilation system, sprinkler system with pumping station, smoke venting system and automatics + BMS (building management system)
  • PRAKTIKER Home Improvement Store
    Full preparation, organisation and completion of internal sanitary installations including development of as built technical documentation, called “Construction of PRAKTIKER Home Improvement Store” including: heating substation, central heating and process heat system, cold and hot tap water system, sanitary and process sewage system, hydrant system, ventilation system, sprinkler system with pumping station, ice water system, automatics + BMS (building management system)
  • ZAKŁADY CHEMICZNE „Siarkopol” TARNOBRZEG Sp. z o.o.
    • Preparation of a design, supply and installation of dispersed heat sources for production facilities and offices including start-up and training of personnel
  • Ball Packaging Europe Sp. z o.o., Radomsko
    Extension of central heating, compressed air and cooling water systems
  • Wawel S.A., Dobczyce
    • Construction of steam boiler room of the capacity of 2 x 4t of steam/h and power installations for Polimex-Mostostal Siedlce S.A.
    • Construction of 2 x 2.5 MW water boiler room
  • Zakłady Mięsne (Meat Processing Plant) Madej&Wróbel, Ruda Śląska
    Construction of process installations and 5.2 MW steam boiler room
  • Przedsiębiorstwo Komunalne Therma (Therma Municipal Plant) Sp. z o.o., BielskoBiała
    Construction of heavy-duty 5 MW gas and oil boiler room
  • Silesian Stadium, Chorzów
    Construction of 2 x 1600 kW boiler room for heating needs and for the needs the stadium playing field heating for PBOiUT Śląsk Sp. z o.o.
  • Zakład Energetyki Cieplnej (Heat Supply Company ) Sp. z o.o., Wałcz
    Overhaul of the WR-10 no. 1 boiler in the KR-2 District Boiler Room in Wałcz
  • SMAK Sp. z o.o., Żory
    Design and thematic development of local container-type 2 MW gas and oil-fired steam boiler room of 2150 kg/h of steam capacity on the premises of “SMAK’ factory in Żory.
  • PRYMAT Sp. z o.o., Żory
    • Construction of heating substation in an existing heat exchanger room on the premises of the production plant in Żory
    • Overhaul and renovation of coal boiler room on the premises of the production plant in Żory
  • Kombinat Koksochemiczny „ZABRZE” („ZABRZE” Coke Chemical Plant) S.A.
    • Construction of company fire protection hydrant system in Dębieńsko Coke Plant
    • Analysis of adaptation of industrial coal burning steam boilers for burning coke-oven gas
    • Expert assessment of steam boiler with cogeneration system encasement in "Dębieńsko" Coke Plant
    • Air-conditioning and ventilation incl. automation of quality control and environment protection laboratory
  • Mining Construction Companies in Gliwice
    Construction of two steam boiler rooms of total power of 18 MW
  • Przedsiębiorstwo Komunalne Therma (Therma Municipal Company) Sp. z o.o., BielskoBiała
    Construction of gas and oil-fired steam boiler room of the capacity of 18t of steam/h
  • Roca Polska Sp. z o.o., Gliwice
    Manufacturing of halls’ heating system for the time of construction
  • WTE Wassertechnik (Poland) Sp. z o.o.
    • Construction of a heavy-duty 2 MW process boiler room as a part of the project called “Renovation of “Orzegów” Sewage Treatment Plant in Ruda Śląska”
  • DALKIA Łódź S.A.
    Construction of two gas boiler rooms of total power of 8 MW on the premises of the Indesit Company Polska Sp. z o.o. factory in Radomsko
  • Pollena-Savona Sp. z o.o., Katowice
    Design and construction of oil and gas boiler room
  • Fabryka Maszyn ("FAMUR" Machinery Factory) "FAMUR" S.A., Katowice
    • Design and construction of 1.5 MW gas boiler room
    • Heat management improvement
  • Sandvik Baildonit S.A., Katowice
    Renovation of 2.3 MW gas boiler room
  • Kompania Węglowa (Mining Corporation) S.A.
    Encasement of 8 MW water (gas) boiler in Jankowice Combined Heat and Power Plant in Rybnik - Boguszowice
  • Fabryka Porcelitu "Tułowice" („Tułowice”Semi-Vitreous Chinaware Factory), Tułowice
    Construction of heavy-duty 3 x 4.5 MW of heating capacity gas and oil boiler room – subcontractor of REMAK S.A., Opole
  • Energomontaż - Południe S.A., Katowice
    Renovation of heating system in the Będzin-Łagisza plant
  • Węgliki Spiekane Baildonit Sp. z o.o., Katowice
    Renovation of the plant’s heating system - design, steam installation, renovation of heat source, assembly and commissioning of 4.2 MW gas and oil boiler room, renovation of internal central heating system
  • Huta Będzin (Będzin Steel Mill) S.A., Będzin
    Improvement of the plant’s power management
  • Kopalnia Piasku "Kuźnica Warężyńska" ("Kuźnica Warężyńska" Sand Mining Company) S.A., Dąbrowa Górnicza
    Improvement of the plant’s heat management
  • Huta Zabrze (Zabrze Steel Mill) S.A., Zabrze
    Improvement of heating system
  • DB Schenker Rail Spedkol Sp. z o.o., Kędzierzyn-Koźle
    Renovation of thermal energy and heating source in Kędzierzyn-Koźle
  • Przedsiębiorstwo Transportu Kolejowego (Railway Transport Company) Holding S.A., Zabrze
    • Development of power audit
    • Development of construction and detailed construction designs of the rain water sewage system, sanitary sewage system, water supply mains and waste treatment plant on the premises of PTK Holding S.A. in Ruda Śląska
    • Separation of a sanitary and rain water sewage system on the premises of PTK ZNiUT Sp. z o.o. in Pyskowice Dzierżnie
    • Construction of rain water sewage system, sanitary sewage system, water supply system, pre-insulated heating system and construction of sewage treatment station on the premises of PTK ZNiUT Sp. z o.o. in Ruda Śląska
    • Completing the ventilation and air-conditioning system and heating system in office building of PTK in Zabrze – ice water system and fan coils, CFC and ventilation, air-conditioning, precise air-conditioning system.
    • Designing and encasement of sewage discharge duct in Dąbrowa Górnicza
    • Connecting sanitary and rain water sewage service lines on the premises of PTK Holding S.A.
  • Przedsiębiorstwo Transportu Kolejowego i Gospodarki Kamieniem (Railway Transport Company and Stone Management), Zabrze
    Improvement of the plant’s heat management in Pyskowice-Dzierżnie
  • Zakład Komunikacji Tramwajowej (Tram Transport Company) nr 1, Będzin
    Improvement of the plant’s heat management
  • Przedsiębiorstwo Komunikacji Miejskiej (Municipal Transport Company) in Sosnowiec
    Improvement of the plant’s heat management
  • Przedsiębiorstwo Komunikacji Miejskiej (Municipal Transport Company) in Gliwice
    Improvement of the plant’s heat management
  • Zakład Komunikacji Tramwajowej (Tram Transport Company) nr 2, Gliwice
    Improvement of the plant’s heat management
  • Zakład Komunikacji Tramwajowej (Tram Transport Company) nr 3, Bytom
    Improvement of the plant’s heat management
  • Przedsiębiorstwo Komunikacji Miejskiej (Municipal Transport Company) in Jastrzębie-Zdrój
    Improvement of the plant’s heat management
  • Beskidiana, Bielsko-Biała
    Improvement of the plant’s heat management
  • Elektro-Zamet Sp. z o.o., Piekary Śląskie
    Improvement of the plant’s heat management
  • HH Poland Sp. z o.o., Gliwice
    Completion of a warehouse hall heating system
  • Logstor Ror Polska Sp. z o.o.
    Construction of the Production and Storage Plant including a refreshment and office section in Gliwice at 115 Wyczółkowskiego St. General contractor of internal installations: hydrant, fire protection system with tank incl., boiler room technology, gas, process heat, heating and ventilation systems, heating system, water supply and sewage system, ice water system, ventilation and air-conditioning as well as central heating system.
  • Market Plus Sp. z o.o.
    • Construction of storage and warehouse hall with refreshment and office section in Zabrze, at Pyskowicka St.
    • General contractor for all internal mains and installations: boiler room technology, central heating, gas, ventilation and electrical installations
  • FORUM Shopping and Entertainment Centre in Gliwice
    Construction of cooling and heating systems; connecting and start-up of cooling units, ventilation units and fan coils, start-up of complete heating, ventilation and air-conditioning system
  • IQ Sp. z o.o. KLIMAT S.k.
    Completing the precise air-conditioning installation in the City Hall in Ruda Śląska
  • Swimming pool in Brzeszcze
    Ventilation and air-conditioning installation
  • House of Sport in Radlina
    Ventilation system, solar installation, heat exchanger room, central heating system supplying heat to ventilation units and to swimming pool water heat exchangers
  • Triada Travel Agency, Warsaw
    Design and manufacturing of ventilation and air-conditioning system together with central heating, water supply and sewage system and hydrant system
  • City Hall in Łazy
    Development of energy audit and technical documentation for thermal insulation of the Primary School’s building
  • Zakłady Mechaniczne "WIROMET" (“WIROMET” Mechanical Plant) S.A.
    Energy audit
  • Wojskowe Zakłady Mechaniczne (Military Mechanical Plant) S.A., Siemianowice Śl.
    • Energy audit
    • Development of full documentation including a design and cost estimate for roof replacement and thermal renovation of production halls with all necessary expert opinions and arrangements.